Euskara
Zulu
Latinus
Cymraeg
தமிழ்
Slovak
Galician
Afrikaans-
Website Group
We Help Customers To Meet The Great Challenges Of Our Time.
VIEW PRODUCTSSelf-Cleaning Overband Magnet on a Shuttle Conveyor: Does Reversible Belt Direction Matter?
Nov 28,2026
Author:
HUATAO
Key Takeaways
- A shuttle conveyor reverses flow to fill alternate stockpiles, so the magnet sees material from two directions instead of one.
- Asymmetric pole designs can lose 30–45% capture when the belt runs backward.
- The working gap changes between directions because the tight/slack side alternates.
- Fixed-side iron discharge can move tramp metal into the "clean" stockpile unless the chute geometry controls it.
- Seeded capture tests must be repeated in both travel directions before sign-off.
Summary Table
Item | Description |
Function | Continuous removal of tramp iron from a bidirectional (reversing) shuttle conveyor |
Typical equipment | Suspended self-cleaning overband separator or permanent overband unit |
Critical variables | Pole symmetry, working gap (both directions), bed depth, exposure time, discharge geometry |
Capture window | t = L/v — effective magnetic length divided by belt speed |
Direction penalty (asymmetric design) | 30–45% capture loss in the reverse pass |
Fix | Symmetric poles, centered installation, two-direction gap survey, chute with rejection flap |
Maintenance focus | Cleaning-belt tracking and tension, gap log, seeded tests, doubled flex-cycle wear |

Case Study
Customer type: Multi-product aggregates terminal operating a four-bay stockyard.
Ore type: Crushed granite and road-base blends, 150–300 mm lump, damp after rain.
Operating conditions: 1,400 mm shuttle conveyor, 2.0 m/s both directions, 1,100 t/h, tripper dwell filling one bay at a time.
Problem: Iron recovery audits found the reverse pass capturing only ~55% of seeded pieces versus ~93% forward; two bucket teeth and several plate fragments reached the tertiary cone over one season, and steel fragments were reported in the "clean" sand pile after reverse-running weeks.
Solution: The existing asymmetric-pole suspended unit was replaced with a symmetric-pole self-cleaning overband installed at the span midpoint; the working gap was reset from a two-direction sag survey (worst case 330 mm); a baffled discharge chute with an intermediate rejection box was fitted between the pile edges; and acceptance was defined as seeded capture agreement within 10% across both directions.
Result: Seeded capture settled at 91–96% in both directions; iron reaching any product pile dropped to zero over the following six months; crusher liner incidents fell from three per year to zero; weekly rejection-box audits became the plant's leading indicator for burden-path drift. The plant's engineers now run the same two-direction protocol on every suspended iron magnet they buy.
FAQ
Q1: Does belt direction really matter for an overband magnet?
A: Yes. Direction swaps the magnet's leading and trailing edges, changes the working gap through tight/slack side alternation, and changes where released iron travels. A symmetric, centered installation removes the penalty; an asymmetric one can lose 30–45% capture in reverse.
Q2: Where should the magnet sit on a shuttle conveyor?
A: At the midpoint of the carrying strand, so both travel directions present the burden symmetrically. Near-pulley positions inherit transfer-point turbulence and make one direction geometrically weak.
Q3: How do I set the working gap on a reversing belt?
A: With the belt loaded, measure clearance at the magnet station in both directions and set for the worst case. Expect a 20–40 mm difference between directions on typical stockyard spans, and log the gap monthly.
Q4: Permanent or electromagnetic for a shuttle conveyor?
A: Permanent units suit stable gaps and low power budgets; electromagnetic overbands deliver deeper flux for heavy or variable burdens and allow remote de-energizing. Match the choice to measured burden depth, not price alone.
Q5: Why is iron ending up in my clean stockpile?
A: Almost always re-entrainment: pieces release at the magnet's far edge, miss the fixed chute, and ride the belt to whichever pile is active. Fix the trajectory with a baffle and add a rejection box between the pile edges.

Contact Us
Contact: Annie Lu
Email: annie.lu@huataogroup.com
Phone / WhatsApp: +86 180 3242 2676
Website: http://www.tufflexscreen.com
We warmly welcome customers from around the world to contact us and establish mutually beneficial partnerships.
Contact Us
E-mail:
team3@huataogroup.com
Phone/WhatsApp:
+86-13331385676
Address:
NO.298 Zhonghua North Street,Shijiazhuang city, China.
Phone/WhatsApp:
Email:
Huatao Group will make every effort to supply all industry-related products you are looking for in China. Once cooperation, lifelong partner.
Leave Message
LINKS: